In 1998 Victoria was named Assistant News Director/Reporter for the Myrtle Beach bureau and in 1999 became News Director.
Touch up warranty work begins on the Barefoot Swing Bridge in North Myrtle Beach today.
Single lane closures will occur, but the bridge will remain open to traffic.
The work is expected to take about two weeks.
Related Links