Read more: Local, Community, Harry Dill, Sterling Homes, Cabinets, Trim, Driveway
Thursday night
 / Whitney Gramling
There was a flurry of activity at the Extreme Makeover Home Edition site Thursday night.
They're actually about two hours ahead of schedule and have a busy night.
"What they're doing right now, they're stocking the cabinets. You can see in the background they're stocking the cabinets. The house has already been primed. They're putting the interior trim it in now. By in the morning, we'll have all the cabinets installed and be putting the tops on them. And be out here pouring the driveway first thing," Harry Dill with Sterling Homes told NewsChannel 15.
In talking with both builders Thursday night, they are both amazed by the dedication and hard work of the volunteers who do everything with a smile on their faces.
To leave a comment, scroll down and click on "post a comment."