|
|
|
News for the Carolinas
-
|
|
Monday, November 28, 2011
Residents of one North Myrtle Beach community are feeling a little landlocked these days. There are only two ways in and out of Barefoot Resort and for the next month and a half, one of them will be closed for repainting a swing bridge.
|
-
|
|
Sunday, November 27, 2011
Starting at 6:00 a.m. Monday, the Barefoot Swing Bridge in North Myrtle Beach will be closed. Contractors are painting the bridge because the paint on it right now is lead based.
|
-
|
|
Wednesday, November 23, 2011
Pat Dowling, spokesman for the City of North Myrtle Beach, says if the painting contractor working on the Barefoot bridge finishes its scheduled work today, then all lanes of the bridge will be open on Thursday and Friday.
|
-
|
|
Monday, November 14, 2011
Work on the Barefoot Swing Bridge in North Myrtle Beach started Monday. Contractors are getting the bridge ready for painting.
|
-
Monday, September 19, 2011
The city of North Myrtle Beach is moving forward with a plan to fix the lead based paint on a swing bridge, something they've been planning for a few years. Residents worried about the detours say now is not the time.
|
-
|
|
Monday, September 12, 2011
Repairs are in the works for the Barefoot Swing Bridge in North Myrtle Beach. In the summer months, drivers make more than 9,000 trips over the bridge that connects the Barefoot Resort area to Barefoot Landing and Highway 17 in North Myrtle Beach.
|
-
Friday, January 29, 2010
Water Tower Road in North Myrtle Beach is now back open to through traffic.
|
-
Wednesday, January 13, 2010
Starting Thursday, Water Tower Road in the North Myrtle Beach area will be closed to traffic, due to paving.
|
-
Monday, January 04, 2010
Paving work was scheduled to begin today on Water Tower Road in North Myrtle Beach.
|
|